Faster, sharper, more projects

Choose your profile, adjust the 4 actions of a typical project and see the impact of Elevant.AI on time, quality and team capacity.

How do you deliver your projects?

Your company profile indicative values per profile, adjustable

1

Typical project parameters

8
30
€500

Average fully loaded cost per working day for the employees involved in the project.

The 4 actions of a project weight adjustable · Elevant.AI acceleration per action

These rates also drive the methodological consistency index shown below.

Analysis of inputs documents received
30 %
Elevant.AI acceleration80 %
Client interaction meetings, interviews, presentations
25 %
Elevant.AI acceleration15 %
Output review expert judgment
20 %
Elevant.AI acceleration40 %
Report drafting writing and formatting
25 %
Elevant.AI acceleration90 %

A. Time saved 58 %. B. Annual savings €70,000. C. Methodological consistency 73 %. D. Additional initiatives / year +11.

A. Time saved
58 %
17 days saved / project, 140 days / year
B. Annual savings
€70,000
in-house cost freed up, at constant project volume (140 days saved/year)Estimate based on the assumptions you entered. Order of magnitude, not contractual.
C. Methodological consistency
73 %
3 actions out of 4 applied systematically
D. Additional initiatives / year
+11
with the same team

Team capacity: before / after

Per team / entity

Without Elevant.AI8 projects/year
With Elevant.AI19 projects/year

Where quality improves

Level of standardisation per action (based on each action's Elevant.AI acceleration)

Analysis of inputs · standardised by Elevant.AI80 %
Client interaction · remains human-led15 %
Output review · standardised by Elevant.AI40 %
Report drafting · standardised by Elevant.AI90 %

On Analysis of inputs and Output review and Report drafting, the same methodology applies to every project whoever runs it: 73 % of these steps are standardised, reducing quality variance from one project to the next. Client interaction remains almost entirely human-led: meeting time cannot be compressed, and that is where relationship and judgment make the difference.

You have just quantified your gap

The next step is to test it on one of your real projects.

Run your first analysis

The link contains the assumptions you entered, day rates included.